{"id":795238,"date":"2025-02-24T14:08:56","date_gmt":"2025-02-24T14:08:56","guid":{"rendered":"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/"},"modified":"2026-07-28T01:12:08","modified_gmt":"2026-07-28T01:12:08","slug":"energyq-fems-case-study-en","status":"publish","type":"post","link":"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/","title":{"rendered":"Factory Energy Management System (FEMS) Case Study: Deploying EnergyQ"},"content":{"rendered":"<h1><\/h1>\n<p>Reducing energy costs and running operations efficiently are key challenges for manufacturers. In factories with heavy power consumption in particular, energy management translates directly into cost savings. As a result, many companies are considering adopting a FEMS (Factory Energy Management System). In this article, we introduce how Customer A achieved successful energy savings with EnergyQ.<\/p>\n<h2>What Is EnergyQ?<\/h2>\n<p>Thingplus\u00ae EnergyQ is a service that helps factories reduce energy costs, improve efficiency, and practice sustainable management through electrical energy consumption monitoring and power quality management.<\/p>\n<h3>Key Features<\/h3>\n<p>\u2013&nbsp;Real-time monitoring: Check the power usage of various facilities across the factory in real time<\/p>\n<p>\u2013&nbsp;Data analysis and anomaly alerts: Detect sources of wasted power early and support peak management<\/p>\n<p>\u2013&nbsp;PQM (Power Quality Management) capability: Maximize equipment efficiency through power quality analysis<\/p>\n<p>\u2013&nbsp;Automatic power quality reports (EN50160): Regularly inspect the quality of electrical equipment and correct issues<\/p>\n<blockquote>\n<p>EN50160 is a European standard (EN, European Norm) that&nbsp;defines the quality of supplied power.<\/p>\n<p>The standard specifies quality requirements for voltage, frequency, harmonics, momentary interruptions, and more from power suppliers, so that users&#8217; electrical equipment can operate reliably.\u200b<\/p>\n<p>EnergyQ&#8217;s automatic EN50160 power quality reporting evaluates whether the power used in the factory complies with this standard and enables a rapid response when problems occur.<\/p>\n<\/blockquote>\n<p>Through these capabilities, EnergyQ contributes to cost reduction, regulatory compliance, and ESG management at the factory while supporting the optimization of energy use.<\/p>\n<h2>Why Customer A Adopted EnergyQ<\/h2>\n<p>Customer A is a manufacturer operating four factory buildings and numerous outdoor facilities, with some equipment running 24 hours a day. Its average monthly electricity bill reached roughly KRW 80 million, and during power peaks costs climbed past KRW 100 million. We ask for your understanding that, for security reasons, photos of this site cannot be shown.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-8306\" src=\"http:\/\/test.daliworks.net\/wp-content\/uploads\/2025\/02\/\uac00\uc0c1-\uacf5\uc7a5-\uc774\ubbf8\uc9c0.png\" alt=\"\" width=\"1030\" height=\"562\"><\/p>\n<p>A virtual factory image is used for security reasons.<\/p>\n<p>For security reasons, we are showing a photo of a different factory.<\/p>\n<h3>Adoption Goals<\/h3>\n<p>\u2013 Establish measures to cut costs during power peaks<\/p>\n<p>\u2013 Improve efficiency through systematic monitoring of electricity consumption<\/p>\n<p>\u2013 Build an optimal operating strategy through per-equipment power usage analysis<\/p>\n<h2>\u200bThe EnergyQ Deployment Process<\/h2>\n<h3>1. Installing Power Meters<\/h3>\n<p>We analyzed the metering points and deployed power quality meters (PQM), power meters (PM), and the supporting network.<\/p>\n<p>\u2013 Meters installed on switchgear and distribution panels, outdoor air handlers, scrubbers, dust collectors, compressors, and more across the factory<\/p>\n<p>\u2013 Wireless communication environment built so the power usage of key equipment can be collected and analyzed in real time<\/p>\n<h3>2. Real-Time Energy Monitoring<\/h3>\n<p>A real-time monitoring system was applied so the factory&#8217;s energy usage could be seen at a glance.<\/p>\n<p>\u2013 Energy usage visible at a glance for the entire factory, individual equipment, and equipment groups<\/p>\n<p>\u2013 Early identification of and response to energy waste through anomaly detection<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-8304\" src=\"http:\/\/test.daliworks.net\/wp-content\/uploads\/2025\/02\/energyq-dashboard-01.png\" alt=\"\" width=\"1030\" height=\"489\"><\/p>\n<p>The EnergyQ dashboard<\/p>\n<h3>3. Peak Demand Response and Optimization<\/h3>\n<p>Appropriate responses to power peaks were put in place to maximize energy efficiency.<\/p>\n<p>\u2013 Alerts issued when power peaks occur so energy-saving measures can be carried out<\/p>\n<p>\u2013 Per-equipment power consumption patterns analyzed to raise operational efficiency<\/p>\n<h2>Results<\/h2>\n<p>After adopting EnergyQ, Customer A achieved the following outcomes.<\/p>\n<h3>\u200bLower Upfront Investment<\/h3>\n<p>\u2013 Initial deployment costs minimized through a subscription-based SaaS (Software as a Service) model<\/p>\n<h3>\u200bStronger Peak Demand Response<\/h3>\n<p>\u2013 Power usage during peak hours forecast in advance, with operating practices introduced to reduce unnecessary consumption<\/p>\n<h3>\u200bCost Savings Through Power Usage Analysis<\/h3>\n<p>\u2013 Waste eliminated through continuous monitoring of power usage by group<\/p>\n<p>\u2013 Monthly electricity costs reduced by improving inefficient equipment operation<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-8305\" src=\"http:\/\/test.daliworks.net\/wp-content\/uploads\/2025\/02\/energyq-dashboard-02.png\" alt=\"\" width=\"1030\" height=\"489\"><\/p>\n<p>EnergyQ&#8217;s EN50160 report<\/p>\n<h2>Closing Thoughts<\/h2>\n<p>Factory energy management plays an important role not only in cutting costs but also in protecting the environment, sustaining responsible management, and improving productivity. By adopting EnergyQ, Customer A achieved its three goals: lower power costs, stronger peak management, and higher energy efficiency.<\/p>\n<p>We look forward to seeing more manufacturers use EnergyQ to realize efficient energy management and build their own smart factories.\u200b<\/p>\n<hr>\n<p><strong>\u2705 Related content worth reading<\/strong><\/p>\n<blockquote data-secret=\"YsCf4kV8Nx\">\n<p><a href=\"https:\/\/www.daliworks.net\/energyq_industry\/product\/\">Energy efficiency UP, power quality KEEP \u2014 the EnergyQ service<\/a><\/p>\n<\/blockquote>\n<p><iframe loading=\"lazy\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; visibility: hidden;\" title=\"\u201cEnergy efficiency UP, power quality KEEP \u2014 the EnergyQ service\u201d \u2014 Daliworks\" src=\"https:\/\/www.daliworks.net\/energyq_industry\/product\/embed\/#?secret=MOR3DiByoe#?secret=YsCf4kV8Nx\" data-secret=\"YsCf4kV8Nx\" width=\"600\" height=\"338\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe><\/p>\n","protected":false},"excerpt":{"rendered":"<p>See how a manufacturer deployed EnergyQ, a factory energy management system, to respond to peak power demand and cut energy costs.<\/p>\n","protected":false},"author":1,"featured_media":797545,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"uix_meta_title":"","uix_meta_description":"","uix_canonical_url":"","footnotes":""},"categories":[3],"tags":[],"class_list":["post-795238","post","type-post","status-publish","format-standard","has-post-thumbnail","category-use-cases"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.7 (Yoast SEO v26.7) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Factory Energy Management System (FEMS) Case Study: Deploying EnergyQ - Daliworks<\/title>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Factory Energy Management System (FEMS) Case Study: Deploying EnergyQ\" \/>\n<meta property=\"og:description\" content=\"See how a manufacturer deployed EnergyQ, a factory energy management system, to respond to peak power demand and cut energy costs.\" \/>\n<meta property=\"og:url\" content=\"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/\" \/>\n<meta property=\"og:site_name\" content=\"Daliworks\" \/>\n<meta property=\"article:published_time\" content=\"2025-02-24T14:08:56+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-28T01:12:08+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/test.daliworks.net\/wp-content\/uploads\/2026\/07\/en-thumb-795238.png\" \/>\n\t<meta property=\"og:image:width\" content=\"960\" \/>\n\t<meta property=\"og:image:height\" content=\"960\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/#article\",\"isPartOf\":{\"@id\":\"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"http:\/\/test.daliworks.net\/#\/schema\/person\/3e27584084cfeed9ca01e2b2c4341bb4\"},\"headline\":\"Factory Energy Management System (FEMS) Case Study: Deploying EnergyQ\",\"datePublished\":\"2025-02-24T14:08:56+00:00\",\"dateModified\":\"2026-07-28T01:12:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/\"},\"wordCount\":660,\"commentCount\":0,\"image\":{\"@id\":\"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/#primaryimage\"},\"thumbnailUrl\":\"http:\/\/test.daliworks.net\/wp-content\/uploads\/2026\/07\/theme-usecases-795238.png\",\"articleSection\":[\"Use Cases\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/\",\"url\":\"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/\",\"name\":\"Factory Energy Management System (FEMS) Case Study: Deploying EnergyQ - Daliworks\",\"isPartOf\":{\"@id\":\"http:\/\/test.daliworks.net\/#website\"},\"primaryImageOfPage\":{\"@id\":\"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/#primaryimage\"},\"image\":{\"@id\":\"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/#primaryimage\"},\"thumbnailUrl\":\"http:\/\/test.daliworks.net\/wp-content\/uploads\/2026\/07\/theme-usecases-795238.png\",\"datePublished\":\"2025-02-24T14:08:56+00:00\",\"dateModified\":\"2026-07-28T01:12:08+00:00\",\"author\":{\"@id\":\"http:\/\/test.daliworks.net\/#\/schema\/person\/3e27584084cfeed9ca01e2b2c4341bb4\"},\"breadcrumb\":{\"@id\":\"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/#primaryimage\",\"url\":\"http:\/\/test.daliworks.net\/wp-content\/uploads\/2026\/07\/theme-usecases-795238.png\",\"contentUrl\":\"http:\/\/test.daliworks.net\/wp-content\/uploads\/2026\/07\/theme-usecases-795238.png\",\"width\":900,\"height\":900},{\"@type\":\"BreadcrumbList\",\"@id\":\"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"http:\/\/test.daliworks.net\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Factory Energy Management System (FEMS) Case Study: Deploying EnergyQ\"}]},{\"@type\":\"WebSite\",\"@id\":\"http:\/\/test.daliworks.net\/#website\",\"url\":\"http:\/\/test.daliworks.net\/\",\"name\":\"Daliworks\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"http:\/\/test.daliworks.net\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"http:\/\/test.daliworks.net\/#\/schema\/person\/3e27584084cfeed9ca01e2b2c4341bb4\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"http:\/\/test.daliworks.net\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/90362a7be3c47eda1f6836481a440f9bf1e51d1b3c18ec5178ffc06afaa55e98?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/90362a7be3c47eda1f6836481a440f9bf1e51d1b3c18ec5178ffc06afaa55e98?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"http:\/\/test.daliworks.net\"],\"url\":\"http:\/\/test.daliworks.net\/index.php\/author\/admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Factory Energy Management System (FEMS) Case Study: Deploying EnergyQ - Daliworks","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"Factory Energy Management System (FEMS) Case Study: Deploying EnergyQ","og_description":"See how a manufacturer deployed EnergyQ, a factory energy management system, to respond to peak power demand and cut energy costs.","og_url":"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/","og_site_name":"Daliworks","article_published_time":"2025-02-24T14:08:56+00:00","article_modified_time":"2026-07-28T01:12:08+00:00","og_image":[{"width":960,"height":960,"url":"http:\/\/test.daliworks.net\/wp-content\/uploads\/2026\/07\/en-thumb-795238.png","type":"image\/png"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/#article","isPartOf":{"@id":"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/"},"author":{"name":"admin","@id":"http:\/\/test.daliworks.net\/#\/schema\/person\/3e27584084cfeed9ca01e2b2c4341bb4"},"headline":"Factory Energy Management System (FEMS) Case Study: Deploying EnergyQ","datePublished":"2025-02-24T14:08:56+00:00","dateModified":"2026-07-28T01:12:08+00:00","mainEntityOfPage":{"@id":"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/"},"wordCount":660,"commentCount":0,"image":{"@id":"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/#primaryimage"},"thumbnailUrl":"http:\/\/test.daliworks.net\/wp-content\/uploads\/2026\/07\/theme-usecases-795238.png","articleSection":["Use Cases"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/#respond"]}]},{"@type":"WebPage","@id":"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/","url":"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/","name":"Factory Energy Management System (FEMS) Case Study: Deploying EnergyQ - Daliworks","isPartOf":{"@id":"http:\/\/test.daliworks.net\/#website"},"primaryImageOfPage":{"@id":"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/#primaryimage"},"image":{"@id":"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/#primaryimage"},"thumbnailUrl":"http:\/\/test.daliworks.net\/wp-content\/uploads\/2026\/07\/theme-usecases-795238.png","datePublished":"2025-02-24T14:08:56+00:00","dateModified":"2026-07-28T01:12:08+00:00","author":{"@id":"http:\/\/test.daliworks.net\/#\/schema\/person\/3e27584084cfeed9ca01e2b2c4341bb4"},"breadcrumb":{"@id":"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/#primaryimage","url":"http:\/\/test.daliworks.net\/wp-content\/uploads\/2026\/07\/theme-usecases-795238.png","contentUrl":"http:\/\/test.daliworks.net\/wp-content\/uploads\/2026\/07\/theme-usecases-795238.png","width":900,"height":900},{"@type":"BreadcrumbList","@id":"http:\/\/test.daliworks.net\/index.php\/2025\/02\/24\/energyq-fems-case-study-en\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"http:\/\/test.daliworks.net\/"},{"@type":"ListItem","position":2,"name":"Factory Energy Management System (FEMS) Case Study: Deploying EnergyQ"}]},{"@type":"WebSite","@id":"http:\/\/test.daliworks.net\/#website","url":"http:\/\/test.daliworks.net\/","name":"Daliworks","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"http:\/\/test.daliworks.net\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"http:\/\/test.daliworks.net\/#\/schema\/person\/3e27584084cfeed9ca01e2b2c4341bb4","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"http:\/\/test.daliworks.net\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/90362a7be3c47eda1f6836481a440f9bf1e51d1b3c18ec5178ffc06afaa55e98?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/90362a7be3c47eda1f6836481a440f9bf1e51d1b3c18ec5178ffc06afaa55e98?s=96&d=mm&r=g","caption":"admin"},"sameAs":["http:\/\/test.daliworks.net"],"url":"http:\/\/test.daliworks.net\/index.php\/author\/admin\/"}]}},"_links":{"self":[{"href":"http:\/\/test.daliworks.net\/index.php\/wp-json\/wp\/v2\/posts\/795238","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/test.daliworks.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/test.daliworks.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/test.daliworks.net\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/test.daliworks.net\/index.php\/wp-json\/wp\/v2\/comments?post=795238"}],"version-history":[{"count":1,"href":"http:\/\/test.daliworks.net\/index.php\/wp-json\/wp\/v2\/posts\/795238\/revisions"}],"predecessor-version":[{"id":797055,"href":"http:\/\/test.daliworks.net\/index.php\/wp-json\/wp\/v2\/posts\/795238\/revisions\/797055"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/test.daliworks.net\/index.php\/wp-json\/wp\/v2\/media\/797545"}],"wp:attachment":[{"href":"http:\/\/test.daliworks.net\/index.php\/wp-json\/wp\/v2\/media?parent=795238"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/test.daliworks.net\/index.php\/wp-json\/wp\/v2\/categories?post=795238"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/test.daliworks.net\/index.php\/wp-json\/wp\/v2\/tags?post=795238"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}